F750GS / F850GS - (2018 >)


 Product Compatibility

  • Magnum HCR

 
 
  1. Go to vSystem Installation
  2. Go to xSystem Installation
  3. Go to eSystem Installation
 
 

vSystem Installation

Step 1 - Find a vacuum source 

 
 
 

The first step is to find the vacuum connection on your bike. This could be an already existing and blanked of vacuum spigot, a vacuum blanking screw, a vacuum operated fuel tap or a balancing pipe between your cylinders. Once you have identified your vacuum source connect it with the vacuum damper elbow and black vacuum line to your Scottoiler. 

 
 
 
 
 
 
 

 Step 2 - Find a place for the reservoir 

 
 

The reservoir can be mounted under the seat or on a frame spar. Ensure that the top of the reservoir is at least slightly raised to maximise the available range.

 
 
 
 
 
 

Step 3 - Mount the dispenser and connect the system

 
 

Make sure that the Injector lightly touches the face of the sprocket. Use spindle mounts, bobbin mounts or chain guards to install the dispenser assembly. 

After you are happy with the placement of both the reservoir and the dispenser secure all parts before starting with the routing of the oil delivery tube. Take your time to find the best and most secure routing, avoiding hot engine and exhaust parts and taking suspension movement into account.  

 
 
 
 

Step 4 - Fill, prime and set up your vSystem

 

Once fitted, fill and prime the system and set the adjuster knob to ’prime’. Start the engine and turn the adjuster knob until a flow of between 1 and 2 drops per minute is achieved. Check the condition of your chain after a ride, and then adjust as required.  

For best results clean your chain before fitting the Scottoiler using paraffin or similar. Then lightly oil the chain from the bottle using a rag or a brush, this allows the oil from the Scottoiler to reach both sides of the chain. 1 to 2 drops per minute will maintain this film of oil on the chain.

 


 

xSystem Installation

Step 1 - Find a place for the xSystem unit

 

The xSystem reservoir unit can be mounted in various locations on your motorcycle such as frame tubes or under the seat. The reservoir must be at least at a a slight angle with the outlet facing downwards. 

 

 

Step 2 - Connect the xSystem to the battery

The xSystem must be wired directly to the battery. Attach the red wire to the +ve terminal and attach the black wire to the -ve terminal.

Slightly loosen the battery terminal screws to slip in the spade connectors. 

 

 

Step 3 - Mount the multiform dispenser on the rear sprocket

 

The multiform dispenser block can be manipulated and cut to fit most swing arms. Assemble the dispenser unit as per instructions. Identify the exact location before taking of the adhesive. Match up the adjustment of your chain with the adjustment of the multiform block to allow for forward/backward adjustment in line with your chain adjustments. 

Before taking off the adhesive thoroughly clean the area and then wipe it down with the included IPA Alcohol Wipes to remove any residue. 

 

Alternatively you can use the micro dispenser plate by itself on any other mounting point on your rear sprocket such as bobbin mounts or toe guards. 

 

The delivery tubing can be routed along the swing arm using self- adhesive cable clips. For further information see our easy step installation guide - Dispenser Positioning

 

 

 

Step 4 - Fill, prime and install the check valve

 

Identify a desired location for the check valve in the delivery line. The location of the check valve can be anywhere along the delivery line and should be protected from outside elements. Fill the reservoir and prime the pump until oil reaches your desired check valve location. Cut and insert the check valve with the arrow facing in the direction of the oil flow. Repeat priming the pump until oil reaches the sprocket.

 

 

Step 5 - Set the flow rate

 

Set the flow rate on the middle section and adjust if required up/down depending on your riding conditions. 

The xSystem will automatically switch on/off and no manual activation is necessary. You can manually turn the system on/off if you transport the motorcycle on a ferry or trailer.

 

 

 


 

eSystem Installation

 

 



Article Number: 499
Posted: Thu, Oct 11, 2018 3:42 PM
Last Updated: Fri, Jan 18, 2019 3:44 PM

Online URL: http://kbvps.scottoiler.com/article/f750gs-f850gs-2018.html